At BoomTree, we're currently working on three playgrounds for The Green Community Motor City. Playground 1 is progressing, while work on Playground 2 is also underway. It's a good opportunity to explain what happens between a concept drawing and a place children can actually use.

1. Understand the site before installing anything

Every site has its own constraints: available area, access routes, existing landscaping, ground levels, and the ages of the children likely to use it. The layout also needs to account for circulation, supervision, and appropriate spaces around equipment. A successful community playground should feel connected to its surroundings, not squeezed into an available corner.

2. Coordinate the equipment and materials

For a natural timber playground, each structure and connection needs to suit the design and the installation environment. Planning the delivery sequence and access for installers helps reduce unnecessary handling on site. Timber is chosen for its natural appearance and tactile qualities, but it still needs the right specification, detailing, and ongoing care for UAE conditions.

3. Build the play experience

Installation is more than placing a slide beside a climbing frame. Teams assemble structures, check positioning, and bring together routes for climbing, balancing, imaginative play, and movement. On multi-playground projects, each space can offer its own experience while still feeling part of the same community.

4. Complete surfacing and checks

The surrounding surface is part of the playground, not an afterthought. Impact-attenuating surfacing, clearances, and equipment condition need to be considered against the applicable design and safety requirements. Appropriate inspection and documentation should take place before the play area is opened; a photograph or quick visual check is not a substitute for that process.

5. Plan for the years after opening

Once children start using the space, maintenance becomes essential. Routine inspections, cleaning, and timely repairs help owners manage wear and protect their investment. A handover should make clear what needs checking and who is responsible.

Following The Green Community Motor City build

We'll continue sharing real installation updates as the work progresses. The most interesting part is seeing an ordinary outdoor area gradually become a place where neighbours can meet and children can make their own adventures.

Planning a Playground in the UAE?

Speak to BoomTree about a design consultation and the practical steps from concept to installation.